![]() ![]() ![]() These 45 fact sheets provide clear help in addressing common safety and health concerns.I have been an avid supporter of Genstat since starting my PhD in 1985 (gulp!). Variations of these forms to suit the user’s needs are allowable. It is recommended that the qualification and NDT information required by this code be recorded on these forms or similar forms prepared by the user. Also included are laboratory report forms for recording the results of NDT of welds. AWS D1.1-BI, The Official Book of D1.1 Interpretations – 1976 to 2006Ī collection of responses to formal inquiries about the requirements of AWS D1.1 from 1976 to 2006 – see also Official Interpretations AWS D1.5M/D1.5: 2020 Annex N FormsĪ collection of fillable forms that the Structural Welding Committee has approved for the recording of WPS qualification, welder qualification, welding operator qualification, and tack welder qualification data required by the D1.5M/D1.5:2020 code. Note that not all tests referenced are required. Cross references to the required mechanical tests as applicable to the WPS being qualified are provided on the form for ready reference. ![]() Also, Testing Laboratory Data Reports may also be included as backup information or a PQR Test Result Form. A copy of the Mill Test Report for the material tested should be attached. An example of a completed PQR form is provided for guidance in filling out the form. For the WPS, state the allowed ranges qualified by testing or state the appropriate tolerances on essential variable (e.g., 250 amps ± 10%).įor the PQR, the actual joint details and the values of essential variables used in the testing should be recorded. In this case, a supporting PQR is required in addition to the WPS. The WPS may be qualified by testing in conformance with the provisions of Qualification Clause. ![]() J2 is sufficient for the purpose of documenting prequalified WPSs. The WPS forms contain lines for inclusion of information that may not be required by the code these lines need not be completed in order to comply with code requirements. For joint details on the WPS, a sketch or a reference to the applicable prequalified joint detail may be used (e.g., B-U4a). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2022
Categories |